Install Guide

Drip and Drain Station

Goal: Successful Installation

This guide will lead you through the set up process of the drip and drain station. Please see the image below for a sneak peak of the final result.

Pre-Requisite: Activate Devices
Make sure the device is activated. See guide "How to Activate New Devices" for guidance.

Finished Drip & Drain install: plant on runoff tray, drain cup, drip cup, and radio
Step 01

Place Plant on Runoff Tray

Plant lowered onto the runoff tray with 9-inch legs

Assemble 9" legs into the runoff tray, then place tray on bench along with a plant to collect runoff from.

Step 02

Assemble the Drip & Drain Stations

Legs and siphoning tube going into the drain cup

Assemble legs and siphoning tube into the Drip & Drain stations.

Step 03

Locate the Emitter Tubes

Emitter tubes at the drip cup

Locate the same number of emitter tubes use for a single plant.

Step 04

Remove the Emitters

Emitter being pulled off the tube end

Remove the emitters from the tubes.

Step 05

Cut the Tube Ends

Scissors cutting the end of an emitter tube

Cut the end of the tubes to make insertion on to the drip station lid easier.

Step 06

Insert Tubes into the Drip Lid

Tubes inserted through the lid as it goes onto the drip cup

Insert the tubes into the drip station lid and let them protrude about 0.5". Put the lid on the drip station (the taller one).

Step 07

Place Drip & Drain Station on Bench

Drain cup under the runoff tray exit hole with the drip cup and radio on the bench

Place the drain cup on the bench under the exit hole of the runoff tray, then place the drip cup on the bench.

Step 08

Assign Devices

AROYA Setup > Devices screen with an unassigned device selected

Assign the Drip & Drain station in AROYA to start recording data. See guide "How to Assign & Install Sensors" for guidance.

Still have questions?

Reach out to our support team

Contact support