Drip and Drain Station
Goal: Successful Installation
This guide will lead you through the set up process of the drip and drain station. Please see the image below for a sneak peak of the final result.
Pre-Requisite: Activate Devices
Make sure the device is activated. See guide "How to Activate New Devices" for guidance.

Place Plant on Runoff Tray

Assemble 9" legs into the runoff tray, then place tray on bench along with a plant to collect runoff from.
Assemble the Drip & Drain Stations

Assemble legs and siphoning tube into the Drip & Drain stations.
Locate the Emitter Tubes

Locate the same number of emitter tubes use for a single plant.
Remove the Emitters

Remove the emitters from the tubes.
Cut the Tube Ends

Cut the end of the tubes to make insertion on to the drip station lid easier.
Insert Tubes into the Drip Lid

Insert the tubes into the drip station lid and let them protrude about 0.5". Put the lid on the drip station (the taller one).
Place Drip & Drain Station on Bench

Place the drain cup on the bench under the exit hole of the runoff tray, then place the drip cup on the bench.
Assign Devices
.png)
Assign the Drip & Drain station in AROYA to start recording data. See guide "How to Assign & Install Sensors" for guidance.